The Problem WPI consisted of various parking lots around campus that contained many different lighting fixtures that called for specialized solutions. With WPI’s commitment to [...]
The Problem The buildings existing conditions consisted of a marginally functional pneumatic and stand-alone mixture of control systems. Making the previous boilers inefficient, over sized, and [...]
The Problem The old Building Automation System, (BAS) only controlled the boiler room, and the boiler pumps only operated at a constant speed with no ability to reset hot water supply temperature [...]
The Problem Rockland Middle School and High School were having issues with their control board and RTU ducts. It was observed that the RTU was alternating between heating and cooling mode in [...]
Contact Us
We're not around right now. But you can send us an email and we'll get back to you, asap.